Sections

Weather Forecast

Close
Advertisement

Cracks in plant tank found 'unacceptable'

Email

Ellsworth officials and village board members aren't happy to find out about structural defects found in one of the holding tanks at the currently-being-renovated wastewater treatment plant.

Advertisement

The water and sewer committee reported to the board Monday several cracks were found in the concrete of the structure. Some of them were hair line on top of the walls and down the face of the wall, and larger cracks were found near a gate to the tank. It was reported a leak was discovered outside the bottom of the tank as well. A photo of one of the cracks was included with the report.

Village President Gerald DeWolfe wasn't present Monday, but he stated in a letter the structure needs to be torn down and replaced, saying if it were someone's home it would not be acceptable.

Board Member Michael Steele concurred with DeWolfe's letter.

"As of right now, the structure is unacceptable," Steele said.

Public Works Director Greg Engeset also said De Wolfe was "right on target" when comparing the deficiencies at the plant to a new home.

For more please read the Sept. 12 print version of the Herald.

Advertisement
Sean Scallon
Sean Scallon has been a reporter and Sports Editor at the Pierce County Herald newspaper in Ellsworth since 1998. He holds a bachelors degree in communication arts from the University of Wisconsin-Madison. He's also worked at newspapers in Glenwood City, Wisconsin; Marion, Illinois and Shawano, Wisconsin. Sean also works as a sports reporter for other newspapers and websites in RiverTown Multimedia from River Falls to Hudson to New Richmond and Red Wing.
(715) 273-4334
Advertisement
Advertisement
randomness